Description
The commissioning project of Mercy Hospital in Fort Scott, Kan., cost $207,789. It was projected to save $181,310 each year. Actual annual energy savings are $389,000. Simultaneous heating and cooling costs associated with high minimum airflow rates and improper control sequences were the most significant problems.
Units: Dual
Citation: ASHRAE Journal, vol. 52, no. 5, May 2010
Product Details
- Published:
- 2010
- Number of Pages:
- 3
- File Size:
- 1 file , 150 KB
- Product Code(s):
- D-AJ10MayC