Description
This month’s anniversary article by Patrick J. Brooks, P.E., states that designing duct systems must start with an understanding of how pressure losses are calculated and combined and that after the initial design of a system, it still must be analyzed for acoustics, heat transfer, duct construction, allowable leakage and proper installation. After installation the system should be checked to ensure leakage is within allowable specifications and that the system is balanced.
Units: Dual
Citation: ASHRAE Journal, vol. 52, no. 1, January 2010
Product Details
- Published:
- 2010
- Number of Pages:
- 9
- File Size:
- 1 file , 2.5 MB
- Product Code(s):
- D-AJ10Jan05