Description
States that engineers need to shift from simply optimising designs on the assumption of a certain future, to a different mode of planning, assuming uncertainty. Demonstrates one way to address the impacts of uncertainty in a simple life-cycle cost analysis framework. Goes on to characterise design strategies that may be appropriate for accommodating uncertainty about the future availability of R22 and R134a.
KEYWORDS: Designing, refrigerants, refrigeration, cost in use, calculating, R22, R134a.
Citation: Symposium Papers, Atlanta, GA, 1990
Product Details
- Published:
- 1990
- Number of Pages:
- 9
- File Size:
- 1 file , 1 MB
- Product Code(s):
- D-18548