Sale!

OR-94-19-3 — Legal Aspects of Building Commissioning – Claim Avoidance

Original price was: $15.00.Current price is: $7.50.

Conference Proceeding by ASHRAE, 1994

Category:

Description

Outlines how the revised ASHRAE Guideline for Commissioning of HVAC Systems can be used to reduce, if not avoid, claims arising out of the design, installation and start-up of HVAC systems. Uses recently concluded litigation involving a HVAC system as a case study to provide concrete examples of how the guideline could have eliminated mistakes made by all participants in the construction process.

KEYWORDS: USA, legal practice, case studies, buildings, commissioning, regulations, heating, ventilation, air conditioning, designing, installing, starting

Citation: Symposium, ASHRAE Trans. 1994, Vol.100, Part 2

Product Details

Published:
1994
File Size:
1 file , 1.3 MB
Product Code(s):
D-17690