Sale!

SE-99-18-3 — Rehabilitating A Thermal Energy Storage System Through Commissioning

Original price was: $15.00.Current price is: $7.50.

Conference Proceeding by ASHRAE, 1999

Category:

Description

A thermal energy storage system was installed in a 37,000 ft 2 hospital in April 1992. The chiller had to be operated every summer during peak demand periods until the authors rehabilitated system through building commissioning in late 1995. This paper presents information about the building systems, commissioning activities, and the measured energy savings.

Units: I-P

Citation: Symposium, ASHRAE Transactions, vol. 105, pt. 2, Seattle 1999

Product Details

Published:
1999
Number of Pages:
6
File Size:
1 file , 160 KB
Product Code(s):
D-7474