Description
This product is a PDF that contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.
This seminar presents the description of 11 years of multidisciplineteamwork to produce a major building with complex systems and operationat below-targeted energy conditions. The building is a multistoryfacility for Federal Courts and related office functions. The overallprocess was led by GSA of Region 6. The scope for the project incorporatesenhanced requirements for project performance. Final buildingoccupancy was in late 2012 and energy use data is reviewed along withinformation on contribution from the roof-mounted PV system as part ofthe presentations. The HVAC system utilizes a water-side-based integratedeconomizer.
An Overview of the Development and Construction of theNew U.S. Courthouse in Cedar Rapids, Iowa
James Snedegar, GSA Region 6, Kansas City, MO
Product Contains: Slides (pdf), Audio (mp3), Recorded Presentation (mp4), Recorded Presentation (flv)
Selecting Systems to Produce Gold Level Performance
Lincoln Pearce, P.E., BEAP, Member, KJWW Engineering Consultants,Des Moines, IA
Product Contains: Slides (pdf), Audio (mp3), Recorded Presentation (mp4), Recorded Presentation (flv)
Commissioning for the Gold in All the Systems
Alonzo Blalock, P.E., Member, Jacobs Engineering, Fort Worth, TX
Product Contains: Slides (pdf), Audio (mp3), Recorded Presentation (mp4), Recorded Presentation (flv)
The Cedar Rapids Courthouse Actual Energy Performance HasExceeded All Expectations
John Nelson, P.E., GSA Region 6, Kansas City, MO
Product Contains: Slides (pdf), Audio (mp3), Recorded Presentation (mp4), Recorded Presentation (flv)
Run Time: 90 mins.
Citation: ASHRAE Seminar Recordings, 2015 Annual Conference, Atlanta, GA
Product Details
- Published:
- 2015
- Units of Measure:
- Dual
- File Size:
- 1 file , 140 KB
- Product Code(s):
- D-AT15Sem16