Sale!

System Effect Factor: How it Affects Operating Cost

Original price was: $8.00.Current price is: $4.00.

Journal Article by ASHRAE, 2006

Category:

Description

For a building owner concerned with operating costs, the clear- est way to document that the M&E consultant, mechanical contractor and testing, adjusting, balancing (TAB) contractor haveachieved the design energy consumption is to compare the energyconsumption given in the TAB equipment report with that specifi edin approved shop drawings.

Citation: ASHRAE Journal, vol. 48, no. 2, pp. 36-46

Product Details

Published:
2006
Number of Pages:
11
File Size:
1 file , 1.3 MB
Product Code(s):
D-27343