Description
Next in importance to selecting a competent engineer to design and inspect an HVAC project, every sizeable HVAC project should have its controls commissioned by a registered Control Systems Engineer (if possible) or at least a professional engineer with demonstrated HVAC controls experience. The process of controls commissioning is of primary importance to a properly operating building.
Citation: ASHRAE Journal, vol. 43, no. 12, December 2001
Product Details
- Published:
- 2001
- Number of Pages:
- 4
- File Size:
- 1 file , 110 KB
- Product Code(s):
- D-5966